Annual Reviews
The purpose of the Annual Review is to gauge whether the project is still at the correct maturity stage based on the criteria for the current stage, as well as identify any concerns or feedback from the project’s TSC that the LF Energy can help address. Projects will schedule their Annual Review as part of the next meeting of their primary SIG following the anniversary of the project’s acceptance; projects not affiliated with a SIG will schedule their Annual Review as part of a TAC meeting.
Projects should prepare a short presentation for the Annual Review that covers the following points:
- The project’s current activity, including releases, adoption, and committer/contribution growth and diversity.
- Assessment of whether the project is fulfilling the requirements to remain at its current stage or be considered for a different stage.
- Feedback on its experience as an LF Energy project, including benefits from being an LF Energy project and areas that the TAC and LF Energy staff can better support the project.
Projects should use the Annual Review template to structure their presentation.
Annual Reviews require an affirmative majority vote of the TAC for the project to continue at the current stage or the appropriate number of votes outlined for each stage in this document to move to the next stage. If the TAC deems the project not meeting the current stage’s requirements, it may vote to move the project to the appropriate or Emeritus stage. The project may choose to move outside of LF Energy at any time.
Annual Review Schedule
Project | Current Level | Initially Accepted | Last Review Date | Next Review Date |
---|---|---|---|---|
Arras | Sandbox | 2023-01-03 | 2024-07-16 | 2025-07-02 SIG |
Battery Data Alliance | Sandbox | 2024-02-28 | 2024-08-27 | 2025-08-19 SIG |
Carbon Data Specification Consortium (CDSC) | Lfess | |||
CitrineOS | Sandbox | 2024-07-02 | 2024-11-27 SIG | |
CoMPAS | Incubation | 2020-07-06 | ||
covXtreme | Sandbox | 2024-06-04 | 2024-12-04 SIG | |
Data Standards and Tooling SIG | Sig | 2024-08-19 | ||
Digital Substations SIG | Sig | 2024-04-02 | ||
Dynaωo | Incubation | 2023-11-30 | 2024-01-30 | 2025-01-01 SIG |
EV Charging SIG | Sig | 2024-06-24 | ||
EVerest | Earlyadoption | 2022-02-09 | 2024-01-09 | 2025-01-22 SIG |
FledgePower | Incubation | 2021-02-16 | 2024-06-04 | 2025-05-13 SIG |
FlexMeasures | Incubation | 2022-01-05 | 2023-11-28 | 2024-11-20 SIG |
Grid Capacity Map | Sandbox | 2022-02-28 | 2023-10-17 | 2024-10-08 |
Grid eXchange Fabric (GXF) | Earlyadoption | 2020-02-04 | 2024-09-18 | 2025-09-17 SIG |
Grid Operations SIG | Sig | 2024-08-21 | ||
Grid Resilience and Intelligence Platform (GRIP) | Sandbox | 2024-09-17 | ||
Grid Simulation and Modeling SIG | Sig | 2024-07-24 | ||
Hyphae | Incubation | 2021-02-16 | 2024-02-20 | 2025-02-11 SIG |
OpenDSM | Incubation | 2019-06-04 | 2024-09-17 | 2025-09-11 SIG |
OpenGEH | Sandbox | 2022-03-15 | 2024-06-04 | 2025-05-27 SIG |
OpenLEADR | Incubation | 2021-08-03 | 2021-11-23 | 2025-09-17 |
OpenSTEF | Incubation | 2022-02-28 | 2023-11-07 | 2025-02-05 SIG |
OpenSynth | Sandbox | 2024-07-29 | 2024-01-09 | 2025-01-21 SIG |
OperatorFabric | Earlyadoption | 2019-04-30 | 2024-07-16 | 2025-07-16 SIG |
Power Grid Model | Incubation | 2023-09-21 | 2024-02-20 | 2025-02-05 SIG |
PowSyBl | Earlyadoption | 2019-04-30 | 2023-11-28 | 2024-12-04 SIG |
Real Time Data Ingestion Platform (RTDIP) | Sandbox | 2024-06-04 | 2024-01-30 | 2025-01-15 SIG |
SEAPATH | Earlyadoption | 2021-01-07 | ||
Shapeshifter | Incubation | 2021-10-04 | 2024-05-14 | 2025-05-21 SIG |
SOGNO | Earlyadoption | 2021-03-11 | 2024-04-23 | 2025-03-19 SIG |
Super Advanced Meter (SAM) | Lfess | |||
TROLIE | Lfess | 2023-12-01 | 2024-08-27 |