The purpose of the Annual Review is to gauge whether the project is still at the correct maturity stage based on the criteria for the current stage, as well as identify any concerns or feedback from the project’s TSC that the LF Energy can help address. Projects will schedule their Annual Review as part of the next meeting of their primary SIG following the anniversary of the project’s acceptance; projects not affiliated with a SIG will schedule their Annual Review as part of a TAC meeting.

Projects should prepare a short presentation for the Annual Review that covers the following points:

  • The project’s current activity, including releases, adoption, and committer/contribution growth and diversity.
  • Assessment of whether the project is fulfilling the requirements to remain at its current stage or be considered for a different stage.
  • Feedback on its experience as an LF Energy project, including benefits from being an LF Energy project and areas that the TAC and LF Energy staff can better support the project.

Projects should use the Annual Review template to structure their presentation.

Annual Reviews require an affirmative majority vote of the TAC for the project to continue at the current stage or the appropriate number of votes outlined for each stage in this document to move to the next stage. If the TAC deems the project not meeting the current stage’s requirements, it may vote to move the project to the appropriate or Emeritus stage. The project may choose to move outside of LF Energy at any time.

Annual Review Schedule

Project Current Level Initially Accepted Last Review Date Next Review Date
AI SIGSig 2023-11-01 2024-10-29 2025-10-21
ArrasSandbox 2023-01-03 2024-07-16 2025-09-03 SIG
Battery Data AllianceSandbox 2024-02-28 2024-08-27 2025-08-19 SIG
CDSC Connectivity WG (WG3)Working Group 2024-06-26
CitrineOSSandbox 2024-07-02 2024-11-27 SIG
CoMPASIncubating 2020-07-06 2025-06-10
covXtremeSandbox 2024-06-04 2024-12-04 SIG
Data Standards and Tooling SIGSig 2024-08-19
Digital Substations SIGSig 2024-04-02
DynaωoIncubating 2023-11-30 2024-01-30 2025-06-25 SIG
EV Charging SIGSig 2024-06-24
EVerestEarlyadoption 2022-02-09 2024-01-09 2025-01-22 SIG
FledgePowerIncubating 2021-02-16 2024-06-04 2025-05-13 SIG
FlexMeasuresIncubating 2022-01-05 2024-11-20 2024-11-20 SIG
Grid Capacity MapSandbox 2022-02-28 2023-10-17 2024-10-08
Grid Edge Interoperability & Security Alliance (GEISA)Sandbox 2024-11-05 2025-09-11 SIG
Grid eXchange Fabric (GXF)Earlyadoption 2020-02-04 2024-09-18 2025-09-17 SIG
Grid Operations SIGSig 2024-08-21
Grid Simulation and Modeling SIGSig 2024-07-24
Grid2OpSandbox 2024-12-17
GridFMSandbox 2024-11-11 2024-10-29
HyphaeIncubating 2021-02-16 2024-02-20 2025-02-11 SIG
NODE CollectiveSandbox 2024-11-11 2024-04-02 2025-03-25 SIG
OpenDSMIncubating 2019-06-04 2024-09-17 2025-09-11 SIG
OpenGEHSandbox 2022-03-15 2024-06-04 2025-05-27 SIG
OpenLEADRIncubating 2021-08-03 2021-11-23 2025-09-17
OpenSTEFIncubating 2022-02-28 2023-11-07 2025-02-05 SIG
OpenSynthSandbox 2024-07-29 2024-01-09 2025-01-21 SIG
OperatorFabricEarlyadoption 2019-04-30 2024-07-16 2025-07-16 SIG
Power Grid ModelIncubating 2023-09-21 2024-02-20 2025-02-05 SIG
PowSyBlEarlyadoption 2019-04-30 2024-12-04 2025-12-03 SIG
Real Time Data Ingestion Platform (RTDIP)Sandbox 2024-06-04 2024-01-30 2025-01-15 SIG
SC Decarbonisation HubSandbox 2024-09-26 2025-09-11 SIG
SEAPATHEarlyadoption 2021-01-07 2024-12-10
ShapeshifterIncubating 2021-10-04 2024-05-14 2025-05-21 SIG
SOGNOEarlyadoption 2021-03-11 2024-04-23 2025-03-19 SIG
TROLIESandbox 2023-12-01 2024-08-27